1 |
Operator places parts from bins and totes onto Geo Fixtures on Turntable (2V03=V01WR1). |
2 |
Turntable (2V03=V01WR1) rotates. |
3 |
Robots (2V03=V01AR21 and 2V03=V01AR22) makes multiple spot welds and then moves to clear. |
4 |
Robot (2V03=V01AR12) flips assembly and clears. |
5 |
Robot (2V03=V01AR12) moves to EOAT Storage Rack and changes end effector and then returns to home. |
6 |
Robot (2V03=V01AR11) moves to load position, picks up Floor Pan #2, drops part, and moves to clear. |
7 |
Robot (2V03=V01AR21) moves to part and makes multiple spot welds then moves to clear. |
8 |
Robot (2V03=V01AR11) picks up Floor Pan #3, drops part, and moves to clear. |
9 |
Robot (2V03=V01AR21) moves to part and makes multiple spot welds then moves to clear. |
10 |
Turntable (2V03=V01WR1) rotates. |
11 |
Robot (2V03=V01AR12) moves to load position, completes load, and clears fixture. |
12 |
Robot (2V03=V01AR12) moves to EOAT storage rack, changes end effector, and returns to home. |
13 |
Robot (2V03=V01AR11) obtains Floor Pan #2 and waits to load. |
14 |
Robot (2V03=V01AR13) picks the finished assembly. |
15 |
Robot (2V03=V01AR12) drops assembly at the Respot Fixture (2V03=V01UQ51) and moves to clear. |
16 |
Robots (2V03=V01AR23, 2V03=V01AR24, 2V03=V01AR25, 2V03=V01AR26) weld multiple spot welds
at Respot Fixture (2V03=V01UQ51). |
17 |
Robot (2V03=V01AR13) unloads assembly at Station 090. |
18 |
Robot (2V03=V01AR181) makes multiple laser cuts at Geo Fixture (2V03=V02WR1UQ51)
while Turntable (2V03=V02WR1) rotates multiple times. |
19 |
Robot (2V03=V01AR13) obtains finished part and moves to Date Scribe (2V03=V01PF1) where Scribing
is completed. |
20 |
Robot (2V03=V01AR13) loads part to Exit Conveyor (2V03=V01GL12). |